Результаты (
английский) 1:
[копия]Скопировано!
After the statements by the President of Azerbaijan Ǵejdara Aliyev that Caspian oil in any âkomurazìprojde the territory of Georgia, to Tbilisi arrived head of Chevron Oversìz» Richard Macke. He and the head of the Georgian Oil Company signed a contract on the construction of the pipeline in Georgia new and reconstruction of existing.Under the existing mean a pipeline linking the Georgian town of Khashuri and Batumi. Its length is 232 km. This "pipe" tie Georgia with Azerbaijan city of Ali-Bajramli. The final lease facility slated for the first half of 1999. And renewable work plan to complete by May this year. By transportuvatimet′sâ oil from Kazakhstan deposits of Tengìz, as well as the Caspian oil.
переводится, пожалуйста, подождите..